Zeetin Industrial Complex, Plot 1077, Idu Industrial District, Abuja +234 706 170 0112 · info@zeetin.com
How it's made

Inside the Idu line: how a KARYA goes from crate to road in seven stations

Every tricycle Zeetin sells is built on one line at its Abuja complex. We followed a unit from kit inspection to handover.

By Zeetin Newsroom23 Oct 20266 min readInside the plant
Technicians on the Idu line fit a KARYA chassis. Each station is fed by an overhead airline for pneumatic tools.

Technicians on the Idu line fit a KARYA chassis. Each station is fed by an overhead airline for pneumatic tools.

IDU, Abuja — The crates arrive from Semarang stacked two high: chassis, cargo body, wheels, wiring, lamps, and — already built and bench-tested at VIAR's factory — the engine. From here, a KARYA cargo tricycle takes shape across seven stations on the Zeetin assembly line.

Station 1 — Kit inspection

Nothing enters the line until the stores team has checked every crate against VIAR's packing list and recorded the engine and chassis numbers. A kit with a missing or damaged part is quarantined until a replacement is confirmed.

Station 2 — Chassis and rear axle

The bare frame is lifted onto a trolley. Technicians fit the rear axle, leaf-spring suspension and rear wheels — the assembly that carries a payload of 449 kg on the 150 RLn and 700 kg on the 200 Ln.

Station 3 — Engine installation

The water-cooled engine is lowered into the frame and its mounts torqued to specification. The radiator and coolant lines are connected and the drive is coupled to the rear axle, with the reverse-gear assembly in place.

Engine installation on the Zeetin line
Engine and front-end fitting at Idu. Engines arrive factory-built from VIAR.

Station 4 — Front end and electrics

Front forks, headlamp, handlebar and throttle, clutch and brake cables, the CDI unit and the wiring loom follow. Electric and kick starters are tested before the body is fitted.

Station 5 — Cargo body and finishing

The steel bed — 1.80 by 1.25 metres on the 150 RLn, 2.01 by 1.26 on the 200 Ln — is bolted down, followed by seat, mudguards, mirrors, tail lamps and trim. The unit is cleaned and inspected panel by panel in its factory colour.

Station 6 — Quality check and road test

Each tricycle is started, checked for leaks and electrics and driven inside the complex. Only then are its numbers entered in the finished-goods register, making every KARYA traceable from kit to customer.

Station 7 — Handover

At collection the buyer inspects the unit with a Zeetin officer, confirms the engine and chassis numbers against the invoice and signs the Handover Checklist. The tricycle leaves with its Warranty Card, owner's manual, tool kit and free-service schedule.

Zeetin Technologies

Zeetin Technologies — Nigerian tricycle assembly company, NADDC certified, in partnership with VIAR — PT. Triangle Motorindo, Indonesia. Plant commissioned 21 October 2026.

Contact Zeetin Industrial Complex, Plot 1077, Off Atiku Abubakar Way, Industrial Area 1 & Extension, Idu Industrial District, Abuja, FCT +234 706 170 0112 · +234 704 530 9440 info@zeetin.com
© 2026 Zeetin Technologies. All rights reserved. FacebookInstagramX / TwitterYouTubeTerms of Use